04 May 16

Filed in Case Studies

Simon Storage Jetty 1 Upgrade

Southbay were employed to upgrade the berthing facilities at Simon Storage, Teesside. The Jetty Upgrade works to Jetty 1 were necessary to enable larger capacity vessels to use the berthing facility, this was a design and build contract and Fairhurst were our design consultants for the scheme which included the following:- Dismantle and remove the… Read more »

03 May 16

Filed in Case Studies

Sunderland Coastal Maintenance

In 2008 Southbay were awarded a 2 year maintenance framework agreement by Sunderland City Council for all of their coastal maintenance. The works ranged from minor sea wall and groyne repairs to new beach access ramps. During the 2 years Southbay carried out various works, many of them working against the tide in harsh conditions.… Read more »

02 May 16

Filed in Case Studies

Swan Hunter Repairs

The contract for North Tyneside Council involved carrying out repairs on an existing concrete quay structure at the former Swan Hunter shipyard on the north bank of the River Tyne over a period of 8 months. The quay had been modified and adapted over its life and therefore had a number of different forms of… Read more »

01 May 16

Filed in Case Studies

Watch House Quay, Blyth

Works began on the refurbishment of Watch House Quay for the Port of Blyth in October 2013. The works involve installing a combi wall, ground anchors, concrete deck, mooring pontoons and walkway. Gallery

30 Apr 16

Filed in Case Studies

Workington Breakwater

Southbay carried out repairs to the breakwater at the entrance to the Port of Workington in 2007 / 2008. The works involved replacing rock armour to the main breakwater, forming an access path to the navigation light at the end of the breakwater, repairs to the navigation lamp and carrying out pointing and concrete repairs… Read more »