In 2007 Southbay were contracted to carry out concrete repairs to Harrington Habour, Cumbria. Over the years the tide and weather had taken its toll on the harbour and the concrete was failing. The top edge of all the harbour walls and 2no main harbour walls required major concrete repairs to be carried out. The cracked concrete was removed and new precast copings were installed with an in-situ backing and the concrete walls were repaired with spray concrete. New access ladders, mooring rings, fencing and navigation posts were also installed during the works.