Swan Hunter Repairs

The contract for North Tyneside Council involved carrying out repairs on an existing concrete quay structure at the former Swan Hunter shipyard on the north bank of the River Tyne over a period of 8 months. The quay had been modified and adapted over its life and therefore had a number of different forms of… Read more »

01 May 16

Filed in Case Studies

Watch House Quay, Blyth

Works began on the refurbishment of Watch House Quay for the Port of Blyth in October 2013. The works involve installing a combi wall, ground anchors, concrete deck, mooring pontoons and walkway. Gallery

30 Apr 16

Filed in Case Studies

Workington Breakwater

Southbay carried out repairs to the breakwater at the entrance to the Port of Workington in 2007 / 2008. The works involved replacing rock armour to the main breakwater, forming an access path to the navigation light at the end of the breakwater, repairs to the navigation lamp and carrying out pointing and concrete repairs… Read more »

29 Apr 16

Filed in Case Studies

Southbay Plant

Southbay have a range of in-house plant used to carry out works, items of plant include the follow; 20t Hitachi ZX210LC Excavator 14t JS145 Excavator Loadall 6t dumper Schwing static concrete pump Gallery

28 Apr 16

Filed in Case Studies

Southbay Marine Craft

Southbay have a range of in-house marine craft available to carry out works, items of craft include the follow: Guard Dog – Tug/work boat/safety boat to MCA category 6 3no Ribs all to MCA category D – Bay 1 (15hp), Bay 2 (40hp), Bay 3 (60hp) Metal work boats Pontoons Gallery